Intervention
Performance of each single CHiP 50 installed: 49kgh of wood chips consumption, 49kWe of nominal electrical power, 120kWt of nominal thermal power.

Needs
The nearby industrial plant produces wood splitters and saws for firewood and requires a solution to reduce electricity and heat consumption related to the production process and heating of the factory, offices and a small pellet production plant.
Solution
The customer, already operating in the wood supply chain, expresses an immediate interest in our wood chip technology. Once the usable area for the installation of the biomass plant has been identified, we create a positioning layout with all the necessary accessories for its operation. In addition, we visualize the electrical and thermal connection points, the management points for wood chip loading, drying and unloading ashes, so as to facilitate daily management.
Once the preassembly of the accessories and the functional tests have been performed in our workshop, we carry out the installation at the customer, training him about the operations to be performed for simple and immediate management. In addition, the system is equipped with a remote supervision system which, by ensuring continuous monitoring, allows the timely execution of decisive interventions.